Weather matters less than paperwork, ground conditions, and how much lead time you give yourself. Here's how to plan a fence around a date that matters to you.

By the 76 Fence of Magnolia team · Updated

Short answer: Any month works for the fence itself. What changes through the year is how long you wait for a spot on the schedule and how ready your lot is. Plan around HOA and permit lead time first, then the ground, then the calendar.

How the year usually runs

Spring into early summer is when our schedule fills fastest. Late summer through winter tends to be calmer, so a fence ordered in October or January often goes in sooner than the same fence ordered in April.

Rain doesn't take a season off here. NOAA's 1991–2020 normals for Conroe show May, June, and October each averaging more than 5 inches, while February, March, April, and July average closer to 3.3 to 3.5. August is the hottest month, with an average high near 96°F. None of that stops a fence, but it does move individual days. On our sandy-over-clay ground, post holes can hold water for a while after a storm, and a wet hole needs extra work before concrete goes in.

Work back from your date

If the fence has to be up for something specific, like a new puppy, a pool inspection, a closing, or holiday guests, count backward:

  1. Estimate and quote. Book the estimate first, so you have a drawing and materials list for the HOA. Estimates are free.
  2. HOA or architectural review. Every committee runs on its own clock. Walden's committee meets every other Tuesday, with requests due by noon the Friday before. Westwood's guidelines give its committee 30 days to respond. High Meadow Estates won't review an incomplete package. Audubon, Woodforest, and the lake communities have their own processes, and a missing page can cost weeks.
  3. City permit, if you're inside city limits. The City of Magnolia says approval usually takes about two weeks, and most permits expire 180 days after they're issued. We're glad to apply where the city allows it, and when the homeowner has to submit, we help prepare the paperwork and drawings. If we apply and pay the fee, it's passed through to you. See our permit FAQ for Montgomery, Conroe, and county lots.
  4. 811 locates. Before a new install, we place the request at least 48 hours before digging, not counting weekends or legal holidays, and no more than 14 days ahead, as Section 251.151 of the Utilities Code requires. If an HOA or permit delay pushes the start past that window, we file a new one. Our 811 FAQ has the details.
  5. Installation. Most residential fences take one to three days on site.

Pool barriers deserve the most cushion, since a pool often can't pass final inspection until the barrier is up. On a new build, start the HOA application before closing if your builder and HOA allow it; our new-construction guide covers the rest.

Acreage timing

On five or ten acres outside Magnolia, ground access is the bigger factor. A pasture that's soft after a wet stretch can rut badly under a loaded truck and auger, and low corners along a creek may stay wet for days. Late summer is often the easiest window for long runs, since July and August average less rain than May and June and the ground has usually firmed up. If you're clearing brush along the line, getting that done first makes the fence go faster. Our acreage fencing page covers the line walk.

Replacing an old fence

If an old fence has to come out first, tear-out and haul-away are listed on the quote where they apply. They aren't part of the standard per-foot price of a new fence, so compare quotes on that line. If we find something on the day that changes the scope, like buried concrete or extra footage, we confirm it with you before adding any cost. If the up-front number is what's holding you back, financing through Hearth is available.

Plan the stain separately

A new wood fence shouldn't be stained the week it's built. The wood has to dry out first, and during humid stretches that takes longer. Many owners build in spring or summer and stain in the fall, when temperatures are milder and the finish soaks in instead of flashing off a hot board. Fall still brings some of our wettest weeks, so we schedule the staining as a second visit around a dry forecast once the boards are ready.

Quick answers

Can you build in July and August heat?

Yes. Summer installs are routine here. The crew starts early, and concrete sets fine in warm weather. The main summer interruptions are afternoon storms.

What about hurricane season?

Atlantic hurricane season runs June 1 through November 30, and we keep building through it. A named storm can push a start date, and afterward repair calls tend to pile up, which can lengthen waits for new work.

Should I wait until after my pool or patio is finished?

Usually, yes, at least for the section near the work. Heavy equipment needs a way in, and a fence built first can block it or get damaged.

Is fall the dry season for staining here?

Not reliably. At the Conroe station, October averages about 5.4 inches of rain, one of the wettest months of the year. Fall’s advantage is milder temperatures. Pick a stretch of dry days from the forecast rather than counting on the month.

Keep reading

FAQ

Do I need a fence permit in Magnolia or Montgomery?

Your mailing address doesn't decide it. City limits do, and around Magnolia a single road can separate a city permit from no permit at all.

Read more →
Page

Fence Staining, Painting & Power Washing — Magnolia, TX

Read more →
Page

Our Fence Installation Process — Magnolia, TX

Read more →

Ready for a free estimate?

Call or text us, or book a time for us to walk your property and give you a written quote.